Suncoast Parkway 2 (SR 589) from South of SR 700 (US 98) to SR 44
Suncoast Parkway 2, also known as SR 589, is a 4-lane, limited access toll-road extending north for about 13 miles from the existing Suncoast Parkway. It is part of a regional corridor along the western coast of Florida.
Overview
Lane built the second of 2 sections that comprise Suncoast Parkway 2. The section runs from South of SR 700 (US 98) to SR 44 in Hernando and Citrus Counties.
The Suncoast Parkway 2 helps reduce commuting times and improves sustainability by contributing to the reduction of emissions along the existing roadway network between Citrus County and the Tampa Bay Region.
ÃÛÌÒ´«Ã½Zow started in early 2018 and was completed in April 2023.
Technical Highlights
This project involved the construction of:
- 15 bridges
- more than 4.8 million CY of excavation
- more than 3.8 million CY of embankment
- milling and resurfacing
- base work, drainage pipe, retaining walls, and curb and gutter
- traffic signals, lighting, and highway signing
- guardrails, sidewalks, and multi-use trails
RECOGNITION
- Florida Transportation Builders’ Association’s (FTBA) Disadvantaged Enterprise “DBE” Utilization Achievement Award
- Florida Transportation Builders’ Association’s (FTBA) 2022 Best in ÃÛÌÒ´«Ã½Zow Award